Skip to main content
Sarkari MCQs Government Exam Question Bank
Menu
Question no. 56106

A rectangular field has a 4 m breadth and a 5 m diagonal length. What is its total area?

Select your answer for: A rectangular field has a 4 m breadth and a 5 m diagonal length. What is its total area?
Show answer

Answer: A. 12 sq m

Explanation

The Pythagorean theorem relates rectangle length, breadth, and diagonal measurements. Squaring the diagonal five and subtracting squared breadth four gives squared length nine. The length equals three meters, which multiplied by breadth four gives twelve square meters. Right-angled triangles formed by rectangle diagonals obey the classic Pythagorean theorem. Area of a rectangle equals the product of its measured length and breadth. Integer side lengths forming right triangles are known as Pythagorean triples.

Carpenters and builders verify square corners in construction using diagonal measurement checks. Land surveyors calculate rectangular plot areas from boundary lengths and diagonal lines. Screen resolution and geometry calculations rely on diagonal Pythagorean relationships. Option twelve square meters is correct, making other choices incorrect variations. Option four root fourteen square meters miscalculates the side length and area product. Option twenty square meters multiplies length and breadth incorrectly using the diagonal.

Subject
Mathematics
Category
Mathematics
Topic
—
Difficulty
medium

Related questions

Q1. P installs railway tracks between two stations in 16 days and Q in 12 days. Aided by R, they finish the task in 4 days. How many days would R require working alone?

Select your answer for: P installs railway tracks between two stations in 16 days and Q in 12 days. Aided by R, they finish the task in 4 days. How many days would R require working alone?
Show answer

Answer: A. 9(3/5) days

Individual work rates for p and q are one sixteenth and one twelfth respectively. Combined work rate for p, q, and r together is one quarter per day. Subtracting p and q rates from the total gives r rate as five forty ei...

Q2. One pipe fills a reservoir three times quicker than another. Operating together, they fill it in 36 min; how long would the slower pipe take alone?

Select your answer for: One pipe fills a reservoir three times quicker than another. Operating together, they fill it in 36 min; how long would the slower pipe take alone?
Show answer

Answer: C. 144 min

The correct answer is one hundred forty-four minutes for the slower pipe alone. The faster pipe takes x minutes while the slower pipe takes three times x minutes. Solving their combined rate equation yields forty-eight f...

Q3. Oranges are purchased at 11 per rupee, with an equal quantity bought at 9 per rupee. If the entire lot is retailed at 10 per rupee, determine the percentage of profit or loss.

Select your answer for: Oranges are purchased at 11 per rupee, with an equal quantity bought at 9 per rupee. If the entire lot is retailed at 10 per rupee, determine the percentage of profit or loss.
Show answer

Answer: C. 1% loss

Oranges are purchased at eleven per rupee and an equal quantity at nine per rupee. Retailing the entire combined lot at ten per rupee results in a cost price exceeding total revenue. Slight discrepancies between harmonic...

Q4. P, Q, and R finish a project in 24, 6, and 12 days respectively. Working collectively, the task will be finished in________days.

Select your answer for: P, Q, and R finish a project in 24, 6, and 12 days respectively. Working collectively, the task will be finished in________days.
Show answer

Answer: B. 3 3⁄7

Individual work rates for p, q, and r are one twenty fourth, one sixth, and one twelfth. Summing these fractions gives a combined work rate of seven twenty fourths per day. Inverting this combined rate yields twenty four...

Q5. P finishes a project in 15 days and Q in 20 days. After collaborating for 4 days, what proportion of the work remains unfinished?

Select your answer for: P finishes a project in 15 days and Q in 20 days. After collaborating for 4 days, what proportion of the work remains unfinished?
Show answer

Answer: A. 8/15

The correct answer is eight-fifteenths for the proportion of work remaining unfinished. P and Q complete seven-fifteenths of the project during their four days of collaboration. Subtracting seven-fifteenths from one whol...

Q6. P, Q, and R complete a task in 20, 30, and 60 days respectively. How many days are needed if P works continuously with assistance from Q and R every third day?

Select your answer for: P, Q, and R complete a task in 20, 30, and 60 days respectively. How many days are needed if P works continuously with assistance from Q and R every third day?
Show answer

Answer: C. 15 days

P, Q, and R complete the task in twenty, thirty, and sixty days, establishing individual daily work rates. P works every day while Q and R assist every third day, forming a repeating three-day work cycle. This cooperativ...

New!

Mock Test System is now available!

Prepare for your exam with interactive mock tests. Select your subjects, attempt 100 random MCQs against the clock, and see exactly where you stand.

Start Mock Test