Question no. 57936

Time studies aim to establish the duration required to perform a task by_______________?

Select your answer for: Time studies aim to establish the duration required to perform a task by_______________?
Show answer

Answer: B. average worker

Explanation

Time studies establish task durations by observing a qualified average worker performing operations. Rating factors are applied to adjust observed times to match normal worker paces. Evaluating an average worker ensures equitable and realistic labor performance standards. Time study is a structured work measurement technique for recording task performance times. Qualified workers possess the necessary physical attributes, skill, and training for the job. Normal pace represents the effective operating speed of a typical experienced worker.

Industrial engineers set manufacturing piece-rate incentive wages using standard time studies. Assembly plant managers rely on average worker standards to plan daily production schedules. Accurate labor standards prevent employee dissatisfaction caused by unfairly tight time quotas. Observing only a fast worker would create unreasonably difficult performance standards. Observing a slow worker would result in loose standards and reduced factory productivity. New entrants lack standard proficiency, making their timings unsuitable for baseline quotas.

Subject
Engineering
Topic
—
Difficulty
medium

Related questions

Q1. The specific time span by which an activity's completion can be delayed without postponing the start of successor tasks is termed_________________?

Select your answer for: The specific time span by which an activity's completion can be delayed without postponing the start of successor tasks is termed_________________?
Show answer

Answer: C. free float

Free float measures the exact time span an activity can be delayed without postponing the earliest start date of any successor task. This specific float calculation allows project schedulers to absorb minor operational d...

Q2. Executing a specific defined task within the CPM framework is referred to as______________________?

Select your answer for: Executing a specific defined task within the CPM framework is referred to as______________________?
Show answer

Answer: C. activity

Within the Critical Path Method framework, executing a specific defined task is referred to as an activity. Activities consume both time and tangible resources while transforming inputs into project deliverables. Network...

Q3. The simplex algorithm serves as the foundational mathematical method for__________________?

Select your answer for: The simplex algorithm serves as the foundational mathematical method for__________________?
Show answer

Answer: C. linear programming

The simplex algorithm is a standard iterative mathematical procedure used to solve linear programming optimization problems. Linear programming models maximize or minimize objective functions subject to linear constraint...

Q4. Queuing theory models are applied in practice to analyze____________________?

Select your answer for: Queuing theory models are applied in practice to analyze____________________?
Show answer

Answer: D. all of the above

Queuing theory utilizes mathematical probability models to analyze waiting lines, service rates, and customer congestion patterns. These versatile mathematical models apply equally well to inventory control problems, hig...

Q5. The single most important objective underlying proper plant layout design is_____________________?

Select your answer for: The single most important objective underlying proper plant layout design is_____________________?
Show answer

Answer: A. overall simplification, safety of integration

The single most important objective underlying proper plant layout design is overall process simplification and safe integration. Simplifying material flow and ensuring safe workspace integration maximizes manufacturing...

Q6. Travel charts furnish planners with data regarding__________________?

Select your answer for: Travel charts furnish planners with data regarding__________________?
Show answer

Answer: B. a compact estimate of the handling which must be done between various work sections

Travel charts provide a compact matrix summary of material handling volumes between various work sections. Tabulating inter-departmental movement frequencies on a travel chart helps visualize plant material flow patterns...

New!

Mock Test System is now available!

Prepare for your exam with interactive mock tests. Select your subjects, attempt 100 random MCQs against the clock, and see exactly where you stand.

Start Mock Test