Travel charts furnish planners with data regarding__________________?
Show answer Hide answer
Answer: B. a compact estimate of the handling which must be done between various work sections
Explanation
Travel charts provide a compact matrix summary of material handling volumes between various work sections. Tabulating inter-departmental movement frequencies on a travel chart helps visualize plant material flow patterns. Plant layout designers use travel chart data to quantify the physical handling effort required between workstations. Travel charts function similarly to distance-times-load matrices used in facility planning and industrial engineering. Analyzing material handling volume helps engineers minimize total transportation distance within manufacturing facilities. Systematic layout planning relies on quantitative movement data to arrange factory departments logically.
Industrial engineers analyze travel charts to reorganize factory floor layouts and reduce internal transport costs. Minimizing material handling movement between work sections improves overall manufacturing plant operational efficiency. Facility expansion projects utilize travel chart metrics to optimize the proximity of interacting production departments. General material flow ideas provide qualitative impressions rather than the compact quantitative estimates found in travel charts. Equipment rearrangement information is a secondary outcome derived from analyzing primary travel chart handling data. Single station handling estimates focus on localized operations rather than summarizing inter-departmental movement volumes.
- Subject
- Engineering
- Category
- Mechanical Engineering
- Topic
- —
- Difficulty
- medium
Related questions
Q1. Time studies aim to establish the duration required to perform a task by_______________?
Show answer Hide answer
Answer: B. average worker
Time studies establish task durations by observing a qualified average worker performing operations. Rating factors are applied to adjust observed times to match normal worker paces. Evaluating an average worker ensures...
Q2. Industrial time study is defined as__________________?
Show answer Hide answer
Answer: A. the appraisal, in terms of time, of the value of work involving human effort
Industrial time study directly evaluates the time value of human work effort to establish standards. This systematic observation helps management measure productivity and set realistic production quotas for workers. Dete...
Q3. Queuing theory models are applied in practice to analyze____________________?
Show answer Hide answer
Answer: D. all of the above
Queuing theory utilizes mathematical probability models to analyze waiting lines, service rates, and customer congestion patterns. These versatile mathematical models apply equally well to inventory control problems, hig...
Q4. In methods-time measurement, the acronym TMU expands to__________________?
Show answer Hide answer
Answer: B. time measurement unit
In methods-time measurement, the acronym TMU officially expands to time measurement unit. Time measurement units provide a standardized numerical scale for evaluating manual motions. Conversion factors link these special...
Q5. Value engineering is primarily directed toward discovering________________?
Show answer Hide answer
Answer: C. major function of the item and accomplishing the same at least cost without change in quality
Value engineering focuses on identifying an item primary function and achieving it at lowest cost. Cost reduction is accomplished without compromising the required quality, reliability, or performance standards. The meth...
Q6. Material wastage within the storeroom is accounted for through which evaluation method when issuing materials_______________?
Show answer Hide answer
Answer: A. inflated system
An inflated pricing system accounts for inevitable storeroom material wastage by adding a calculated percentage surcharge to issue costs. This accounting method ensures that the cost of minor material shrinkage, handling...