The single most important objective underlying proper plant layout design is_____________________?
Show answer Hide answer
Answer: A. overall simplification, safety of integration
Explanation
The single most important objective underlying proper plant layout design is overall process simplification and safe integration. Simplifying material flow and ensuring safe workspace integration maximizes manufacturing efficiency and productivity. Designers prioritize seamless coordination of personnel, equipment, and materials throughout the facility layout. Plant layout design arranges machinery, workstations, and storage areas within a manufacturing facility. Effective layouts minimize material handling costs, reduce transit times, and enhance worker safety standards. Industrial engineering principles guide the systematic integration of all production factors during layout planning.
Manufacturing companies redesign plant layouts to eliminate operational bottlenecks and reduce production costs. Safe integration of material handling equipment protects workers and prevents costly industrial accidents. Long-term business profitability depends heavily on efficient, well-integrated factory floor layouts. Economy in space is an important secondary consideration, but overall process simplification remains primary. Maximizing travel time in a plant contradicts the core goal of minimizing material handling distances. Avoiding bottlenecks is a key outcome achieved through the primary objective of overall process simplification.
- Subject
- Engineering
- Category
- Mechanical Engineering
- Topic
- —
- Difficulty
- medium
Related questions
Q1. An incentive plan where a standard completion time is set and workers earn a bonus for every hour saved below that benchmark is known as_________________?
Show answer Hide answer
Answer: D. Halsey Premium plan
The Halsey Premium plan sets a standard completion time and awards workers a bonus for time saved. Workers receive their guaranteed hourly wage plus an extra financial percentage for finishing early. This premium incenti...
Q2. Time studies aim to establish the duration required to perform a task by_______________?
Show answer Hide answer
Answer: B. average worker
Time studies establish task durations by observing a qualified average worker performing operations. Rating factors are applied to adjust observed times to match normal worker paces. Evaluating an average worker ensures...
Q3. Industrial time study is defined as__________________?
Show answer Hide answer
Answer: A. the appraisal, in terms of time, of the value of work involving human effort
Industrial time study directly evaluates the time value of human work effort to establish standards. This systematic observation helps management measure productivity and set realistic production quotas for workers. Dete...
Q4. The operational time that yields the absolute minimum direct cost for an activity is recognized as________________?
Show answer Hide answer
Answer: B. slow time
Crash time represents the absolute shortest duration possible to complete a given activity successfully. Slow time or normal time settings carry different cost implications for project managers. Accelerating an activity...
Q5. In methods-time measurement, the acronym TMU expands to__________________?
Show answer Hide answer
Answer: B. time measurement unit
In methods-time measurement, the acronym TMU officially expands to time measurement unit. Time measurement units provide a standardized numerical scale for evaluating manual motions. Conversion factors link these special...
Q6. Value engineering is primarily directed toward discovering________________?
Show answer Hide answer
Answer: C. major function of the item and accomplishing the same at least cost without change in quality
Value engineering focuses on identifying an item primary function and achieving it at lowest cost. Cost reduction is accomplished without compromising the required quality, reliability, or performance standards. The meth...