Question no. 57963

The principal drawback associated with a line organization structure is_________________?

Select your answer for: The principal drawback associated with a line organization structure is_________________?
Show answer

Answer: D. all of the above

Explanation

Line organization structures suffer from overburdened top executives, rigid structures, and potential communication bottlenecks. Because authority flows strictly downward in a single line, top leaders become bogged down with excessive operational details. The lack of flexibility and delayed information transfer make line structures unsuitable for large modern industrial enterprises. The line organization is the oldest and simplest form of administrative authority structure used in industrial management. Every subordinate receives orders from one immediate superior, establishing a clear and unambiguous chain of command. Despite its simplicity, this structure lacks specialized advisory support and struggles to adapt to complex environments.

Excessive executive workload is only one symptom, as communication delays and rigidity compound organizational failure. A rigid hierarchy prevents quick adaptation to changing market conditions and innovative manufacturing requirements. Communication delays occur because information must travel up and down every single level of the chain.

Subject
Engineering
Topic
—
Difficulty
medium

Related questions

Q1. Work sampling observations are systematically scheduled and recorded on the basis of_______________?

Select your answer for: Work sampling observations are systematically scheduled and recorded on the basis of_______________?
Show answer

Answer: C. table of random numbers

Work sampling observations must be scheduled randomly to eliminate personal bias from the data. A table of random numbers ensures that every observation time has an equal chance of selection. Statistical validity relies...

Q2. The standard time established for a specific industrial job is_________________?

Select your answer for: The standard time established for a specific industrial job is_________________?
Show answer

Answer: D. total work content + delay contingency allowance

Standard time is calculated by adding delay and contingency allowances to work content. Allowances account for unavoidable procedural delays, fatigue, and personal worker needs. Total work content represents the basic no...

Q3. Which of the options below qualifies as an example of a group incentive plan?

Select your answer for: Which of the options below qualifies as an example of a group incentive plan?
Show answer

Answer: C. Lincoln Plan

The Lincoln Incentive Plan is a well-known example of a group incentive scheme for productivity. It distributes bonuses based on the collective performance and profitability of the entire workforce. Group plans encourage...

Q4. Which plant layout arrangement is optimized for high-volume mass production_________________?

Select your answer for: Which plant layout arrangement is optimized for high-volume mass production_________________?
Show answer

Answer: B. product layout

A product layout arranges specialized equipment in the exact sequential order of manufacturing operations. This linear workflow minimizes material handling delays and makes it ideal for high-volume mass production. High...

Q5. Total works cost is calculated to include________________?

Select your answer for: Total works cost is calculated to include________________?
Show answer

Answer: D. primary cost + factory expenses

Total works cost is calculated by combining prime cost with factory expenses. Factory expenses cover all overhead costs incurred within the manufacturing plant facility. Prime cost includes direct material, direct labor,...

Q6. How does standard time relate to normal time_______________?

Select your answer for: How does standard time relate to normal time_______________?
Show answer

Answer: A. greater

Standard time is always greater than normal time because necessary allowances are added. Allowances for worker fatigue, personal needs, and unavoidable delays increase the calculated baseline. Without these extra time al...