Industrial work study is primarily concerned with_________________?
Show answer Hide answer
Answer: A. improving present method and finding standard time
Explanation
Industrial work study is primarily concerned with improving existing manufacturing methods and establishing reliable standard times. It achieves these goals through method study to eliminate waste and time study to measure operational performance accurately. Focusing on method improvement and standard times forms the dual foundation of all classical industrial engineering productivity programs. Work study was pioneered by industrial engineering leaders to optimize human effort and machine utilization in manufacturing plants. Method study systematically examines current operational procedures to design simpler, safer, and more efficient work routines. Time study measures the time required for qualified workers to complete specific tasks under normal operating conditions.
Option B worker motivation is an important psychological factor but remains secondary to the primary technical objectives of work study. Option C improving production capability is a broad outcome resulting directly from method improvements rather than the primary operational focus. Option D improving production planning relies on work study data but encompasses broader logistical systems beyond basic method and time study.
- Subject
- Engineering
- Category
- Mechanical Engineering
- Topic
- —
- Difficulty
- medium
Related questions
Q1. Under the provisions of the Apprenticeship Act___________________?
Show answer Hide answer
Answer: D. only industries employing more than 500 workers have to recruit apprentices
Under the Apprenticeship Act, statutory obligations to recruit and train apprentices generally apply to industries employing workforces above specified limits, such as 500 workers. National labor legislation mandates app...
Q2. Work sampling observations are systematically scheduled and recorded on the basis of_______________?
Show answer Hide answer
Answer: C. table of random numbers
Work sampling observations must be scheduled randomly to eliminate personal bias from the data. A table of random numbers ensures that every observation time has an equal chance of selection. Statistical validity relies...
Q3. The standard time established for a specific industrial job is_________________?
Show answer Hide answer
Answer: D. total work content + delay contingency allowance
Standard time is calculated by adding delay and contingency allowances to work content. Allowances account for unavoidable procedural delays, fatigue, and personal worker needs. Total work content represents the basic no...
Q4. Which incentive framework provides motivation to plant supervisors by granting a premium based on worker time savings_________________?
Show answer Hide answer
Answer: C. Haynes plan
The Haynes plan is an incentive system that provides bonuses to supervisors and workers based on earned time standards. Haynes wage incentive systems reward supervisory personnel based on time saved relative to establish...
Q5. Which plant layout arrangement is optimized for high-volume mass production_________________?
Show answer Hide answer
Answer: B. product layout
A product layout arranges specialized equipment in the exact sequential order of manufacturing operations. This linear workflow minimizes material handling delays and makes it ideal for high-volume mass production. High...
Q6. Total works cost is calculated to include________________?
Show answer Hide answer
Answer: D. primary cost + factory expenses
Total works cost is calculated by combining prime cost with factory expenses. Factory expenses cover all overhead costs incurred within the manufacturing plant facility. Prime cost includes direct material, direct labor,...