Skip to main content
Sarkari MCQs Government Exam Question Bank
Menu
Question no. 65750

Which piece of poetry, initially composed in Persian by Allama Iqbal, was later translated into Urdu due to popular demand__________?

Select your answer for: Which piece of poetry, initially composed in Persian by Allama Iqbal, was later translated into Urdu due to popular demand__________?
Show answer

Answer: A. Bang e Dara

Explanation

Allama Iqbal initially composed his philosophical poetry work Bang-e-Dara largely in Persian before Urdu editions. Literary histories note that portions of his early poetic collections saw translation due to popular demand. Urdu readers eagerly sought vernacular versions of his profound Persian philosophical verses. Bang-e-Dara is the first major collection of poetry written by Allama Muhammad Iqbal. The collection contains poems categorized across different periods of his intellectual life. His poetry combined deep philosophical reflections with powerful calls for community awakening.

Translating classical poetry makes timeless literary works accessible to wider linguistic audiences. Iqbal's poetry continues to inspire readers across the globe with its timeless messages of selfhood. Literary critics study these anthologies to trace the evolution of modern Islamic philosophy. Zarb-e-Kaleem is a later poetic work focusing heavily on social critique and activism. Bal-e-Jibraeel represents another prominent collection known for its soaring spiritual themes. Armaghan-e-Hijaz was published posthumously and contains significant portions written in Persian.

Category
Pakistan Studies
Topic
—
Difficulty
medium

Related questions

Q1. How many votes did the PPP secure during the 2013 general elections_______?

Select your answer for: How many votes did the PPP secure during the 2013 general elections_______?
Show answer

Answer: B. 6.8 million

The Pakistan Peoples Party secured approximately 6.8 million votes during the nationwide 2013 general elections. Despite facing strong political headwinds, the party retained a solid base of loyal electoral supporters. E...

Q2. What is the composition/strength of the National Assembly?

Select your answer for: What is the composition/strength of the National Assembly?
Show answer

Answer: D. 272 general seats, 60 women seats and 10 non-Muslim seats

The National Assembly of Pakistan historically comprised 272 general seats alongside reserved seats for women and minorities. Constitutional allocations ensured fair representation by reserving sixty seats specifically f...

Q3. What is the era from 1990 to the present day in Pakistan referred to as_________?

Select your answer for: What is the era from 1990 to the present day in Pakistan referred to as_________?
Show answer

Answer: D. Post Cold War

The era from 1990 onwards is widely termed the Post-Cold War period in international relations and Pakistani political history. This timeframe marks the geopolitical shift following the collapse of the Soviet Union and c...

Q4. Which political figure held the offices of both Governor General and Prime Minister of Pakistan________?

Select your answer for: Which political figure held the offices of both Governor General and Prime Minister of Pakistan________?
Show answer

Answer: A. Khawja Nazimuddin

Khawaja Nazimuddin holds the unique distinction of having served as both Governor-General and Prime Minister of Pakistan. He assumed high executive offices following the demise of Quaid-e-Azam and the assassination of Li...

Q5. What is the legislative body of Pakistan called_______?

Select your answer for: What is the legislative body of Pakistan called_______?
Show answer

Answer: C. Majlis-e-Shoora

The official legislative parliament of the Islamic Republic of Pakistan is formally designated as the Majlis-e-Shoora. This bicameral institution derives its name from Islamic consultative traditions combined with modern...

Q6. What will be the electricity generation capacity of the Diamer Bhasha project_________?

Select your answer for: What will be the electricity generation capacity of the Diamer Bhasha project_________?
Show answer

Answer: D. 4500MW

The Diamer-Bhasha Dam project is designed with a planned electricity generation capacity of 4,500 megawatts. Engineering blueprints and project feasibility studies confirm that this massive hydroelectric installation wil...

New!

Mock Test System is now available!

Prepare for your exam with interactive mock tests. Select your subjects, attempt 100 random MCQs against the clock, and see exactly where you stand.

Start Mock Test