Urgent emergency rush orders can be processed and expedited most effectively within__________________?

Select your answer for: Urgent emergency rush orders can be processed and expedited most effectively within__________________?
Show answer

Answer: D. intermittent production

Explanation

Intermittent production systems feature flexible layouts and general-purpose machinery. This operational flexibility allows job shops to handle custom or rush orders efficiently. Emergency orders can be scheduled into intermittent production without disrupting continuous flows. Production systems are classified into continuous batch intermittent and job shop manufacturing types. Intermittent production handles low-volume customized goods with frequent product design changes. Flexible routing allows machines to process varied custom work orders on short notice.

Tool and die makers use intermittent production to fulfill custom urgent industrial tooling orders. Machine repair shops rely on job shop layouts to process unexpected emergency customer requests. Manufacturing managers choose intermittent systems when product variety is high and volumes low. Job production handles single custom items but lacks the organized flexibility of intermittent batches. Automatic and continuous production systems require rigid fixed tooling unsuited for rush orders. Continuous production lines cannot accommodate custom emergency interruptions without halting operations.

Subject
Engineering
Topic
—
Difficulty
medium

Related questions

Q1. The activity slack or float associated with any node on a PERT/CPM chart is shown by__________________?

Select your answer for: The activity slack or float associated with any node on a PERT/CPM chart is shown by__________________?
Show answer

Answer: D. anyone of the above

Activity float or slack can be calculated using various combinations of latest and earliest start/finish times. Total float represents the amount of time an activity can be delayed without delaying the overall project co...

Q2. PERT methodology functions as__________________?

Select your answer for: PERT methodology functions as__________________?
Show answer

Answer: B. event oriented technique

PERT methodology focuses primarily on milestone events marking the start or completion of tasks. Network nodes represent these critical events rather than just the working activities themselves. This makes PERT fundament...

Q3. A low per-unit manufacturing cost is achievable through____________________?

Select your answer for: A low per-unit manufacturing cost is achievable through____________________?
Show answer

Answer: A. product layout

A product layout arranges machinery in the exact sequence of manufacturing operations. This specialized arrangement minimizes material handling distance and reduces unnecessary transit time. Streamlining the workflow in...

Q4. Statistical acceptance sampling procedures are extensively applied in________________?

Select your answer for: Statistical acceptance sampling procedures are extensively applied in________________?
Show answer

Answer: C. mass production

Statistical acceptance sampling procedures are extensively applied in high-volume mass production manufacturing environments. Inspected lots contain thousands of identical items making complete 100% inspection economical...

Q5. The historical figure acknowledged as the father of time study was_________________?

Select your answer for: The historical figure acknowledged as the father of time study was_________________?
Show answer

Answer: A. F.W. Taylor

F.W. Taylor is widely recognized as the father of scientific management and time study. He pioneered systematic workplace observations using stopwatches to analyze worker motions and establish standard times. Taylor's sc...

Q6. Current assets on a corporate balance sheet include_______________?

Select your answer for: Current assets on a corporate balance sheet include_______________?
Show answer

Answer: A. manufacturing plant

Manufacturing plants and fixed capital assets are long-term non-current assets rather than current assets.

New!

Mock Test System is now available!

Prepare for your exam with interactive mock tests. Select your subjects, attempt 100 random MCQs against the clock, and see exactly where you stand.

Start Mock Test