Urgent emergency rush orders can be processed and expedited most effectively within__________________?
Show answer Hide answer
Answer: D. intermittent production
Explanation
Intermittent production systems feature flexible layouts and general-purpose machinery. This operational flexibility allows job shops to handle custom or rush orders efficiently. Emergency orders can be scheduled into intermittent production without disrupting continuous flows. Production systems are classified into continuous batch intermittent and job shop manufacturing types. Intermittent production handles low-volume customized goods with frequent product design changes. Flexible routing allows machines to process varied custom work orders on short notice.
Tool and die makers use intermittent production to fulfill custom urgent industrial tooling orders. Machine repair shops rely on job shop layouts to process unexpected emergency customer requests. Manufacturing managers choose intermittent systems when product variety is high and volumes low. Job production handles single custom items but lacks the organized flexibility of intermittent batches. Automatic and continuous production systems require rigid fixed tooling unsuited for rush orders. Continuous production lines cannot accommodate custom emergency interruptions without halting operations.
- Subject
- Engineering
- Category
- Mechanical Engineering
- Topic
- —
- Difficulty
- medium
Related questions
Q1. The activity slack or float associated with any node on a PERT/CPM chart is shown by__________________?
Show answer Hide answer
Answer: D. anyone of the above
Activity float or slack can be calculated using various combinations of latest and earliest start/finish times. Total float represents the amount of time an activity can be delayed without delaying the overall project co...
Q2. PERT methodology functions as__________________?
Show answer Hide answer
Answer: B. event oriented technique
PERT methodology focuses primarily on milestone events marking the start or completion of tasks. Network nodes represent these critical events rather than just the working activities themselves. This makes PERT fundament...
Q3. A low per-unit manufacturing cost is achievable through____________________?
Show answer Hide answer
Answer: A. product layout
A product layout arranges machinery in the exact sequence of manufacturing operations. This specialized arrangement minimizes material handling distance and reduces unnecessary transit time. Streamlining the workflow in...
Q4. Statistical acceptance sampling procedures are extensively applied in________________?
Show answer Hide answer
Answer: C. mass production
Statistical acceptance sampling procedures are extensively applied in high-volume mass production manufacturing environments. Inspected lots contain thousands of identical items making complete 100% inspection economical...
Q5. The historical figure acknowledged as the father of time study was_________________?
Show answer Hide answer
Answer: A. F.W. Taylor
F.W. Taylor is widely recognized as the father of scientific management and time study. He pioneered systematic workplace observations using stopwatches to analyze worker motions and establish standard times. Taylor's sc...
Q6. Current assets on a corporate balance sheet include_______________?
Show answer Hide answer
Answer: A. manufacturing plant
Manufacturing plants and fixed capital assets are long-term non-current assets rather than current assets.