Out of 10 project workers, 4 possess degrees. If 3 individuals are picked, what is the likelihood that at least one of them is a graduate?
Show answer Hide answer
Answer: D. 5/6
Explanation
The correct answer is five-sixths probability that at least one worker is a graduate. The probability of choosing no graduates is calculated using combinations of non-graduates. Subtracting the zero-graduate probability from one yields the final five-sixths result. At least one probability is found by taking one minus the probability of the opposite event. There are six non-graduate workers and four graduate workers among the ten total staff. Combinations formula nCr is used to determine selection subsets for the probability fractions.
Probability theory is widely used in quality control and random sampling inspections. Human resources departments apply combinatorial probability when selecting committees from staff pools. Risk assessment models rely on complementary probability calculations to evaluate outcomes. Option A represents the probability of choosing only non-graduate workers instead. Option B results from an incorrect combination fraction during the selection calculation. Option C is an erroneous value that fails to satisfy the complementary probability rule.
- Subject
- Mathematics
- Category
- Mathematics
- Topic
- —
- Difficulty
- medium
Related questions
Q1. Among 100 students, 50 failed in English and 30 in Mathematics, with 12 failing in both. How many students passed in both subjects__________?
Show answer Hide answer
Answer: D. 32
Adding English failures and Mathematics failures, then subtracting dual failures gives thirty-eight. Total students failing at least one subject equals fifty plus thirty minus twelve. Subtracting this failure count from...
Q2. P and Q complete a job in 8 days, while Q and R finish it in 12 days. If P, Q, and R together accomplish it in 6 days, how many days will P and R need working together?
Show answer Hide answer
Answer: B. 8
The combined rate of P and Q is one eighth per day, while the combined rate of Q and R is one twelfth per day. Subtracting the combined rate of P and Q from the total rate of all three workers yields R individual rate. C...
Q3. Nawaz Sahrif allots 10% of his earnings to house rent, 25% of the remainder to miscellaneous expenses, and 20% of the remaining amount to his children's education. If he is left with Rs. 1944, what is his total income_______?
Show answer Hide answer
Answer: A. Rs.3600
Deductions occur sequentially for house rent, miscellaneous expenses, and children education. Working backward from nineteen forty four reverses each successive percentage deduction. Dividing and multiplying through thes...
Q4. P and Q finish a task in 30 days, Q and R in 24 days, and R and P in 20 days. After working together for 10 days, Q and R depart. How many additional days will P require to complete the task?
Show answer Hide answer
Answer: C. 18
Individual work rates for worker pairs are established by inverting their respective completion days. After working together for ten days, a specific fraction of the total project is successfully completed. Subtracting t...
Q5. P accomplishes a task in the exact duration Q and R need combined. P and Q finish it together in 10 days, whereas R alone takes 50 days. How many days will Q require independently__________?
Show answer Hide answer
Answer: B. 25 days
P's work rate equals the combined rate of Q and R operating together. R alone takes fifty days, meaning R completes one fiftieth of the task per day. Combining individual and joint rates in a system of equations gives Q...
Q6. P and Q finish a job in 20 days and 12 days respectively. P begins alone, and Q joins him after 4 days until completion. What was the total duration of the work?
Show answer Hide answer
Answer: B. 10 days
P works alone for four days at a rate of one twentieth per day, completing one fifth of the total task. The remaining four fifths of the work is finished by P and Q together at a combined rate. Combining individual rates...