A lays a track in 16 days, B in 12 days, and with C's help, they finish it in 4 days. How many days will C alone take_________?
Show answer Hide answer
Answer: B. 9.6
Explanation
Worker A finishes in sixteen days, worker B in twelve days, and all three together in four days. Subtracting A and B individual daily rates from the combined three-worker rate isolates C rate. Calculating the reciprocal of C net daily fraction yields nine point six days for completion. The combined rate of three workers equals the sum of their individual daily productivity fractions. Isolating an unknown worker rate requires subtracting known rates from the total group rate. Decimal conversions of fractions are frequently used in work rate problems with non-integer results.
Analyzing multi-party project contributions helps managers identify high-impact team members. Industrial engineering applications use similar rate subtraction models to evaluate machinery efficiency. Accurate time estimation prevents project delays in construction and manufacturing industries. Option four days represents the combined completion time of all three workers together. Option nine days slightly underestimates the exact fractional rate calculated for worker C. Option ten days overestimates the speed of worker C based on the individual rate subtractions.
- Subject
- Mathematics
- Category
- Mathematics
- Topic
- —
- Difficulty
- medium
Related questions
Q1. A boatman rows 2 km against the current in 1 hour and 1 km with the current in 10 minutes. How long will it take to travel 5 km in stationary water?
Show answer Hide answer
Answer: C. 1 hr 15 min
Upstream speed is two kilometers per hour since two kilometers take one hour to travel. Downstream speed is six kilometers per hour because one kilometer takes one sixth of an hour. Still water speed is four kilometers p...
Q2. A bag contains five white and four red balls. Two balls are drawn randomly from the bag. What is the probability that they belong to different colors?
Show answer Hide answer
Answer: B. 5/9
Selecting two balls of different colors means choosing one white ball and one red ball. The number of ways to choose one white and one red ball is five multiplied by four. Dividing this favorable combination count by tot...
Q3. A boy walks to school at 3 km/hr and returns at 2 km/hr. If the total trip takes 5 hours, find the distance from his house to the school:___________?
Show answer Hide answer
Answer: C. 6 km
Applying the harmonic mean formula for equal distance trips calculates the average travel speed. Multiplying the calculated average speed by the total time of five hours gives the round-trip distance. Dividing the total...
Q4. A boat travels upstream from B to A and downstream from A to B in 3 hours. With still water speed at 9 km/hr and current at 3 km/hr, what is the distance between A and B:_______?
Show answer Hide answer
Answer: D. 12 km
Downstream speed equals still water speed plus current speed giving twelve kilometers per hour. Upstream speed equals still water speed minus current speed giving six kilometers per hour. Letting distance be d, d over tw...
Q5. A box contains 3 blue, 4 red, 6 green, and 2 yellow marbles. Selecting two at random, what is the probability of getting either blue or yellow?
Show answer Hide answer
Answer: C. 2/21
Favorable outcomes involve selecting two marbles that are either blue or yellow from the box. There are three blue and two yellow marbles, giving five target marbles to choose from. Dividing favorable pairs by total poss...
Q6. A completes 1/3 of a job in 5 days, and B does 2/5 of it in 10 days. How many days will they take working together?
Show answer Hide answer
Answer: A. 75/8 days
Determining A's total completion time gives fifteen days, while B's total time equals twenty-five days. Adding A's daily rate of one-fifteenth to B's daily rate of one-twenty-fifth yields their combined rate. Taking the...