Question no. 55320

A completes 1/3 of a job in 5 days, and B does 2/5 of it in 10 days. How many days will they take working together?

Select your answer for: A completes 1/3 of a job in 5 days, and B does 2/5 of it in 10 days. How many days will they take working together?
Show answer

Answer: A. 75/8 days

Explanation

Determining A's total completion time gives fifteen days, while B's total time equals twenty-five days. Adding A's daily rate of one-fifteenth to B's daily rate of one-twenty-fifth yields their combined rate. Taking the reciprocal of the combined work rate results in seventy-five eighths days. Partial completion data allows calculation of total time by multiplying by the reciprocal fraction. Combined worker productivity equals the sum of individual daily output rates. Project completion duration is the inverse of the combined daily work rate.

Construction scheduling relies on individual contractor productivity rates to forecast completion dates. Task management platforms aggregate worker speeds to estimate collaborative project timelines. Arithmetic problem sets frequently test fractional work conversions and combined rates. Forty-four sixth days represents an incorrect simplification of the combined work rate. Forty-eight fifths days underestimates the time required for joint project completion. None of these is incorrect because the first option provides the exact correct value.

Subject
Mathematics
Category
Mathematics
Topic
—
Difficulty
medium

Related questions

Q1. A lays a track in 16 days, B in 12 days, and with C's help, they finish it in 4 days. How many days will C alone take_________?

Select your answer for: A lays a track in 16 days, B in 12 days, and with C's help, they finish it in 4 days. How many days will C alone take_________?
Show answer

Answer: B. 9.6

Worker A finishes in sixteen days, worker B in twelve days, and all three together in four days. Subtracting A and B individual daily rates from the combined three-worker rate isolates C rate. Calculating the reciprocal...

Q2. A completes a job in 6 days and B in 8 days. They contract the job for Rs. 3200 and finish it in 3 days with C's help. How much should C be paid?

Select your answer for: A completes a job in 6 days and B in 8 days. They contract the job for Rs. 3200 and finish it in 3 days with C's help. How much should C be paid?
Show answer

Answer: D. Rs. 400

Contract wages are distributed strictly according to the actual work completed by each individual. A and B working with C for three days allows determining C's specific work share fraction. Multiplying C's work fraction...

Q3. A boat travels upstream from B to A and downstream from A to B in 3 hours. With still water speed at 9 km/hr and current at 3 km/hr, what is the distance between A and B:_______?

Select your answer for: A boat travels upstream from B to A and downstream from A to B in 3 hours. With still water speed at 9 km/hr and current at 3 km/hr, what is the distance between A and B:_______?
Show answer

Answer: D. 12 km

Downstream speed equals still water speed plus current speed giving twelve kilometers per hour. Upstream speed equals still water speed minus current speed giving six kilometers per hour. Letting distance be d, d over tw...

Q4. In a kilometer race, A gives B a 100-meter start and C a 200-meter start. What start can B give C in a kilometer race?

Select your answer for: In a kilometer race, A gives B a 100-meter start and C a 200-meter start. What start can B give C in a kilometer race?
Show answer

Answer: A. 111.12 m

In a one thousand meter race, A runs the full distance while B runs nine hundred meters. A also gives C a two hundred meter start, meaning C runs eight hundred meters in that time. Comparing B and C running speeds yields...

Q5. A finishes a kilometer race in 4 1/2 min, whereas B completes it in 5 min. What meter head start should A provide B so they finish simultaneously?

Select your answer for: A finishes a kilometer race in 4 1/2 min, whereas B completes it in 5 min. What meter head start should A provide B so they finish simultaneously?
Show answer

Answer: D. 100 m

Comparing the finishing times of A and B establishes the exact ratio of their running speeds. Calculating the distance B covers during A's running time determines the necessary head start. Subtracting B's covered distanc...

Q6. A vehicle travels 360km when its fuel tank is ¾ full. What distance can it cover with a 2/3 full tank?

Select your answer for: A vehicle travels 360km when its fuel tank is ¾ full. What distance can it cover with a 2/3 full tank?
Show answer

Answer: B. 320

A vehicle traveling three hundred sixty kilometers on three quarters of a tank has a full range of four eighty kilometers. Multiplying the total tank range of four eighty kilometers by two thirds gives the new distance c...