Basic motion time systems quantify fundamental human motions in units equal to ten-thousandths of_______________?

Select your answer for: Basic motion time systems quantify fundamental human motions in units equal to ten-thousandths of_______________?
Show answer

Answer: B. minute

Explanation

Predetermined motion time systems quantify fundamental human motions in Time Measurement Units equal to ten-thousandths of an hour. One TMU is specifically defined as zero point zero zero zero zero six hours, which equals zero point zero zero zero six minutes. Standard industrial engineering practices use TMUs to establish consistent standard times for manual operations. Methods-Time Measurement breaks manual work down into basic elemental motions like reach, grasp, and move. Time Measurement Units provide a universal standard for comparing labor productivity across different manufacturing plants. Industrial engineers convert TMU values into seconds or minutes when scheduling assembly line workstations.

Manufacturing companies use basic motion time systems to optimize workstation layouts and balance production lines. Accurate labor standards improve cost estimation, pricing strategies, and worker performance evaluations. Ergonomic analysis benefits from breaking physical tasks down into fundamental human motion elements. Measuring units in ten-thousandths of a second would yield excessively small numbers for standard industrial motions. Measuring in minutes directly without ten-thousandth scaling contradicts the standard definition of Time Measurement Units. Hourly units require conversion multipliers, making minute-based base definitions the standard reference standard.

Subject
Engineering
Topic
—
Difficulty
medium

Related questions

Q1. Under the MAPI replacement formula guidelines, an aging machine should be superseded by a new model when_____________?

Select your answer for: Under the MAPI replacement formula guidelines, an aging machine should be superseded by a new model when_____________?
Show answer

Answer: A. CAM < DAM

Under MAPI replacement formula guidelines an aging machine is superseded when adverse minimum average is lower than next-year operating inferiority. The challenger machine minimum average cost represents its annualized c...

Q2. Real or practical fluids are characterized by___________________?

Select your answer for: Real or practical fluids are characterized by___________________?
Show answer

Answer: D. possess all the above properties

Real fluids possess viscosity, surface tension, and compressibility, unlike idealized theoretical fluids. Every practical fluid exhibits internal frictional resistance to shear flow, quantified as dynamic or kinematic vi...

Q3. The Critical Path Method (CPM) is defined as___________________?

Select your answer for: The Critical Path Method (CPM) is defined as___________________?
Show answer

Answer: E. all of the above

The Critical Path Method is an activity-oriented programmatic tool for scheduling projects. It relies on single deterministic time estimates for each defined project activity. CPM applies effectively to both repetitive c...

Q4. Achieving an optimum project schedule implies that_______________?

Select your answer for: Achieving an optimum project schedule implies that_______________?
Show answer

Answer: B. lowest possible cost and shortest possible time for project

An optimum project schedule achieves the lowest possible cost and the shortest possible time for execution. Project crashing adds direct costs to reduce duration until indirect expenses and crashing costs balance perfect...

Q5. The activity slack or float associated with any node on a PERT/CPM chart is shown by__________________?

Select your answer for: The activity slack or float associated with any node on a PERT/CPM chart is shown by__________________?
Show answer

Answer: D. anyone of the above

Activity float or slack can be calculated using various combinations of latest and earliest start/finish times. Total float represents the amount of time an activity can be delayed without delaying the overall project co...

Q6. PERT methodology functions as__________________?

Select your answer for: PERT methodology functions as__________________?
Show answer

Answer: B. event oriented technique

PERT methodology focuses primarily on milestone events marking the start or completion of tasks. Network nodes represent these critical events rather than just the working activities themselves. This makes PERT fundament...