What elements must be uncovered during risk identification ?
Show answer Hide answer
Answer: D. All of the mentioned
Explanation
Risk identification requires uncovering threats vulnerabilities and potential consequences. Comprehensive risk analysis examines all aspects that could harm the project. Ignoring any of these elements leaves the software vulnerable to failure. Risk management is a proactive engineering discipline aimed at avoiding disasters. Threats represent external hazards while vulnerabilities are internal weaknesses. Consequences measure the severity of damage if a risk materializes.
Teams conduct risk identification workshops during early project planning stages. Documenting vulnerabilities helps developers write more secure and resilient code. Understanding consequences allows managers to prioritize mitigation strategies effectively. Threats alone only cover external hazards without accounting for system weaknesses. Vulnerabilities alone ignore external threat actors and potential impact scales. Consequences alone miss the root causes of potential project failures.
- Subject
- Computer Science
- Category
- Software Engineering
- Topic
- —
- Difficulty
- medium
Related questions
Q1. Which procedure represents a structured attempt to outline hazards to project plans ?
Show answer Hide answer
Answer: D. Risk projection
Risk projection systematically evaluates the probability and impact of identified project hazards. This procedure prioritizes potential problems so teams can address high-impact threats first. Estimating future risks hel...
Q2. Which feature is excluded from Version management capabilities ?
Show answer Hide answer
Answer: B. Build script generation
Build script generation is a function of build management tools rather than core version management. Version management focuses on identifying versions, recording change history, and tracking releases. Generating compila...
Q3. Which item is excluded from the five information domain metrics of Function Point (FP) decomposition ?
Show answer Hide answer
Answer: C. External process
Function Point analysis evaluates system size using five standardized operational information domain metrics. External inputs outputs inquiries internal logical files and interface files comprise the official metric set....
Q4. What process involves preparing software for external deployment and tracking released system versions for clients ?
Show answer Hide answer
Answer: B. Release management
Release management handles preparing software versions for deployment and tracking client distribution. This process ensures that production environments receive properly tested and verified builds. Tracking distributed...
Q5. Which procedure ensures that system and component versions are logged and preserved?
Show answer Hide answer
Answer: B. Configuration control
Configuration control is the formal procedure ensuring system and component versions are logged and preserved. It establishes a controlled mechanism for evaluating, approving, and recording changes. Without configuration...
Q6. Which risk involves a procured third-party component failing to meet performance expectations ?
Show answer Hide answer
Answer: A. Product risk
Product risks directly threaten the quality performance or technical integrity of the software system. A procured third-party component failing to meet specifications introduces severe technical vulnerabilities into the...