Solve for ? in [50 – {20 + 60% of (26/13 + 24/12 + 21) – 2} + 8] = 625/?
Show answer Hide answer
Answer: A. 25
Explanation
Simplifying the bracketed expression step-by-step according to the order of operations results in 25. Evaluating the inner bracket yields 2 plus 2 plus 21, totaling 25, with 60 percent being 15. Continuing the bracket reduction leads to an equation where 625 divided by 25 equals 25. Order of operations dictates solving innermost parentheses and brackets first. Percentage calculations are performed before final addition and subtraction steps. Isolating the denominator variable involves dividing 625 by the simplified bracket value.
Complex nested equations test rigorous adherence to mathematical precedence rules. Financial engineering models frequently require resolving multi-layered bracketed formulas. Systematic reduction prevents errors in multi-step quantitative assessments. Option b overestimates the denominator value by miscalculating bracket totals. Option c provides a fractional result that does not satisfy the balanced equation. Option d represents an incorrect decimal fraction derived from calculation errors.
- Subject
- Mathematics
- Category
- Mathematics
- Topic
- —
- Difficulty
- medium
Related questions
Q1. Working together, 8 children and 12 men finish a specific task in 9 days. Given that a child requires double the duration of a man, how many days will 12 men need for this exact task ?
Show answer Hide answer
Answer: D. 12 days
By equating the total work to man-days, 12 men can complete the task in 12 days since a child requires twice the duration. A child requires double the duration of a man, meaning a child's work rate is half a man's. Solvi...
Q2. A and B complete a task in 21 and 24 days respectively. Starting together, A leaves after some time, and B finishes the remainder in 9 days. When did A leave?
Show answer Hide answer
Answer: C. 7
Calculating the remaining work completed by worker B in nine days establishes the unfinished fraction. Working backward from the remaining fraction reveals the output produced by both workers together. Dividing the joint...
Q3. A and B complete a project in 8 days, B and C in 13 days, and C in 12 days. Working together, A, B, and C finish it in 6 days. How long will A and C take together_________?
Show answer Hide answer
Answer: C. 8 days
Using the combined work rates of A, B, and C, the combined rate of A and C gives 8 days. Subtracting B's individual work rate from the combined pair rates isolates the individual rates of A and C. Combining the individua...
Q4. In an election with two candidates, 8% of voters abstained. The winner secured 48% of all votes and beat the opponent by 1100 votes. What was the total voter count_________?
Show answer Hide answer
Answer: D. 27500
With 8% abstaining, 92% voted. The winner got 48%, leaving 44% for the opponent. The 4% difference equals 1100 votes, making the total 27500. The percentage difference between the winner and opponent is 4 percent of tota...
Q5. A and B complete a project in 20 days, B and C in 30 days, and C and A in 40 days. How many days will A alone need for the job?
Show answer Hide answer
Answer: A. 48
Summing the combined rates of all worker pairs yields twice the overall productivity rate. Subtracting the combined rate of workers B and C isolates the individual rate for worker A. Inverting worker A's net productivity...
Q6. A and B complete a project together in 15 days, while B alone finishes it in 20 days. How many days will A alone need?
Show answer Hide answer
Answer: C. 60 days
Subtracting B's work rate from the combined work rate of A and B yields A's individual rate, 60 days. The combined daily output of A and B equals one-fifteenth of the project per day. Subtracting B's daily rate of one-tw...