Skip to main content
Sarkari MCQs Government Exam Question Bank
Menu
Question no. 55231

Solve 3648.24 + 364.824 / ? – 36.4824 = 3794.1696

Select your answer for: Solve 3648.24 + 364.824 / ? – 36.4824 = 3794.1696
Show answer

Answer: A. 2

Explanation

Solving the decimal equation for the unknown divisor gives the exact integer value of 2. Isolating the term containing the unknown divisor allows for precise decimal subtraction and division. Substituting 2 back into the equation confirms the equality of both sides to the required decimal. Decimal equations require maintaining precise decimal places across all addition and subtraction steps. Isolating an unknown divisor involves moving constant decimal values to one side of the equation. Verifying equation solutions through substitution ensures mathematical accuracy on complex decimal problems.

Financial auditors verify complex decimal transactions and divisor terms when balancing ledger accounts. Scientific computations rely on precise decimal tracking to prevent rounding errors in physical formulas. Quantitative examinations include decimal divisor puzzles to test meticulous calculation habits. 3 is incorrect because substituting 3 into the divisor position fails to yield the target sum. 4 overestimates the required divisor value when tested in the decimal equation balance. 5 significantly underestimates the required divisor needed to satisfy the decimal calculation.

Subject
Mathematics
Category
Mathematics
Topic
—
Difficulty
medium

Related questions

Q1. Find the value of ? in (830 + ? * 3 * 14 / 100) – (830 * 14 * 3 / 100) = 20.16

Select your answer for: Find the value of ? in (830 + ? * 3 * 14 / 100) – (830 * 14 * 3 / 100) = 20.16
Show answer

Answer: D. None of these

Evaluating the equation yields a result not matching standard options, making option d correct. The positive and negative percentage terms cancel out when expanded fully. Simplifying the algebraic expression leaves 830 p...

Q2. Calculate 9000 + 16 2/3 % of ? = 10500

Select your answer for: Calculate 9000 + 16 2/3 % of ? = 10500
Show answer

Answer: C. 9000

Subtracting nine thousand from ten thousand five hundred gives one thousand five hundred as the difference. The value one thousand five hundred represents sixteen and two thirds percent of the unknown number. Converting...

Q3. A path 25 cm wide is constructed around a circular garden of 4 meters diameter. Find the approximate area of this path in square meters__________?

Select your answer for: A path 25 cm wide is constructed around a circular garden of 4 meters diameter. Find the approximate area of this path in square meters__________?
Show answer

Answer: A. 3.34

Calculating the area of the circular path around a 4-meter garden gives approximately 3.34 square meters. The garden diameter is 4 meters, making its radius 2 meters. Adding the 25 cm path width gives a total radius of 2...

Q4. A and B start a venture with Rs.3000 and Rs.4000. After 8 months, A withdraws Rs.1000 and B invests an additional Rs.1000. If annual profits total Rs.630, find A's share.

Select your answer for: A and B start a venture with Rs.3000 and Rs.4000. After 8 months, A withdraws Rs.1000 and B invests an additional Rs.1000. If annual profits total Rs.630, find A's share.
Show answer

Answer: A. Rs.240

Calculating capital-time investment ratios for the year gives A a share of Rs.240. A's investment is Rs.3000 for 8 months plus Rs.2000 for 4 months, totaling Rs.32000. Dividing A's weighted capital proportion by the tota...

Q5. A and B finish a job in 15 and 10 days respectively. They begin together, but after 2 days B leaves, leaving A to finish the remaining work. In how many days was the entire job completed___________?

Select your answer for: A and B finish a job in 15 and 10 days respectively. They begin together, but after 2 days B leaves, leaving A to finish the remaining work. In how many days was the entire job completed___________?
Show answer

Answer: C. 12 days

Pipe or worker completion rates are calculated by determining the fraction of work done per day. Person B completes two tenths or one fifth of the total work during the first two days. Person A finishes the remaining fou...

Q6. Working together, 8 children and 12 men finish a specific task in 9 days. Given that a child requires double the duration of a man, how many days will 12 men need for this exact task ?

Select your answer for: Working together, 8 children and 12 men finish a specific task in 9 days. Given that a child requires double the duration of a man, how many days will 12 men need for this exact task ?
Show answer

Answer: D. 12 days

By equating the total work to man-days, 12 men can complete the task in 12 days since a child requires twice the duration. A child requires double the duration of a man, meaning a child's work rate is half a man's. Solvi...

New!

Mock Test System is now available!

Prepare for your exam with interactive mock tests. Select your subjects, attempt 100 random MCQs against the clock, and see exactly where you stand.

Start Mock Test