B works at a rate 3 times faster than A. Collaborating on a project, they finish it within a single day. How much time would B require to complete the project independently?
Show answer Hide answer
Answer: A. 32 hours
Explanation
Combined work rates of A and four units per day finish the project in one single day. Working individually at one fourth of the total rate means B requires four thirds of a day. Converting four thirds of a day into hours by multiplying by 24 yields exactly 32 hours. Work rates are inversely proportional to the time required to complete a given task. Collaborative output equals the sum of individual working rates operating simultaneously together. Time conversion between fractional days and hours requires multiplying by 24 hours per day.
Project management relies on combining individual team member productivities to estimate delivery schedules. Manufacturing plants calculate machine processing speeds to optimize daily production output targets. Construction planning uses rate formulas to determine labor requirements for complex building phases. Option B incorrectly calculates total hours using a flawed daily multiplication factor. Option C misinterprets fractional days without performing the necessary hourly time conversion. Option D represents a flat whole-day estimate that ignores B individual efficiency ratio.
- Subject
- Mathematics
- Category
- Mathematics
- Topic
- —
- Difficulty
- medium
Related questions
Q1. A pupil's combined score in Mathematics and Physics totals 60, and his Chemistry score exceeds his Physics score by 20 marks. Ascertain the combined mean score for Mathematics and Chemistry.
Show answer Hide answer
Answer: A. 40
Given equations show Math plus Physics equals sixty and Chemistry equals Physics plus twenty. Substituting these expressions into the target mean formula gives sixty plus twenty divided by two. Evaluating this simplified...
Q2. An exhibition levied admission fees of Rs.15 on day one, Rs.7.50 on day two, and Rs.2.50 on day three, with attendance across the three days adhering to a 2:5:13 ratio. What was the overall mean ticket price per visitor across the entire exhibition___________?
Show answer Hide answer
Answer: C. Rs.5.00
A weighted average multiplies each ticket price by its corresponding attendance proportion. The weighted sum numerator equals 30 plus 37.50 plus 32.50, totaling 100. Dividing the total monetary sum by the attendance rati...
Q3. Bilal’s room features a floor measuring 8m by 4m. He opts to cover the entire space using tiles sized 25cm by 20cm. Determine the total number of tiles required.
Show answer Hide answer
Answer: B. 640 tiles
Converting room dimensions into centimeters ensures consistent units for area calculation. Dividing the total floor area by the area of a single tile determines the count. The resulting quotient represents the exact numb...
Q4. Barkat, cycling to destination A, calculates that riding at 10 kmph will get him there at 2 P.M., whereas cycling at 15 kmph will result in arrival at 12 noon. What velocity must he maintain to reach A precisely by 1 P.M.?
Show answer Hide answer
Answer: C. 12 kmph
Distance equals speed multiplied by time, equating the two travel scenarios to find sixty kilometers. Traveling sixty kilometers to arrive by one pm requires a total duration of five hours. Dividing the total distance by...
Q5. Determine the arithmetic mean for the dataset: 3, 6, 9, 12, 15.
Show answer Hide answer
Answer: B. 9
An arithmetic sequence with evenly spaced values has its mean at the exact center. The dataset of 3, 6, 9, 12, and 15 contains five clearly ordered terms. The middle number in this symmetric progression is precisely 9. E...
Q6. The mean of two values is XY. If one value is X, what does the other value equal_________?
Show answer Hide answer
Answer: D. 2 XY -2 X
The formula for the mean of two values is the sum divided by two. Setting up the algebraic equation with the given mean allows solving for the unknown. Multiplying both sides by two and isolating the other value yields t...