The total allowed time allocated for a work task equals the standard time plus___________________?
Show answer Hide answer
Answer: A. policy allowance
Explanation
The total allowed time allocated for a work task equals the standard time plus policy allowance. Policy allowances are management-granted time additions included for specific organizational reasons. These extra percentages accommodate special working conditions beyond normal fatigue and personal needs. Standard time provides the baseline calculation for normal operations under typical environmental conditions. Management policy allowances might cover minor union agreements, startup delays, or special tasks. Adding policy allowances ensures that incentive standards remain fair under atypical operating constraints.
Industrial engineers coordinate with plant management to establish fair policy allowance percentages. Transparent allowance policies maintain trust between workers and management regarding incentive pay. Accurate time allocation prevents disputes over daily production quotas in unionized manufacturing facilities. Interference allowance accounts for machine downtime waiting in multi-machine assignment situations. Process allowance covers mandatory technological delays inherent in specific manufacturing machinery. Unforeseen allowance is typically absorbed into standard fatigue factors rather than separate policy additions.
- Subject
- Engineering
- Category
- Mechanical Engineering
- Topic
- —
- Difficulty
- medium
Related questions
Q1. The primary advantage offered by a line organization structure is its_______________?
Show answer Hide answer
Answer: E. all of the above
A line organization structure features a direct vertical chain of command from top to bottom. This direct hierarchy ensures effective command, control, and defined responsibilities. Because all listed attributes are true...
Q2. What is the fundamental distinction between PERT and CPM_____________?
Show answer Hide answer
Answer: D. guessed times are used in PERT and evaluated times in CPM
PERT traditionally incorporates probabilistic three-time estimates to account for uncertainties inherent in complex research and development tasks. Conversely, CPM typically relies on deterministic, evaluated time values...
Q3. Production routing explicitly dictates the_________________?
Show answer Hide answer
Answer: A. flow of material in the plant
Production routing explicitly dictates the exact path and sequence operations take as materials flow through the plant. Routing documents specify every machine, workstation, and process step required to manufacture a com...
Q4. The earliest formalized method invented for industrial project planning was________________?
Show answer Hide answer
Answer: A. bar chart method
The bar chart method was pioneered by Henry Gantt in the early twentieth century. It established the first formalized graphical approach to industrial project planning. This visual scheduling tool laid the groundwork for...
Q5. A process layout format is most advantageously applied where______________?
Show answer Hide answer
Answer: C. few number of non-standardised units are to be produced
Process layouts group similar machines and functional operations together into dedicated departmental areas within the workshop. This functional grouping makes the layout ideal for producing small batches of customized o...
Q6. A positive slack value calculated on a PERT network signals that the project________________?
Show answer Hide answer
Answer: A. ahead of schedule
A positive slack value calculated on a PERT network signals that the project or task is ahead of schedule. Slack represents the amount of extra time leeway available without delaying the overall project completion date....