Reduced levels along a road between chainages 5 and 9 are spaced 30 m apart. Given a uniform up-gradient of 120 to 1, what is the chainage where neither cutting nor filling occurs__________________?

Select your answer for: Reduced levels along a road between chainages 5 and 9 are spaced 30 m apart. Given a uniform up-gradient of 120 to 1, what is the chainage where neither cutting nor filling occurs__________________?
Show answer

Answer: B. (6 + 12) chains

Explanation

Applying the uniform gradient and level differences along road chainages locates the zero cut-fill point. Calculations yield the exact location of zero cutting and filling at six chains plus twelve links. Determining the neutral point where cutting transitions to filling is essential for balancing earthwork volumes. Roadway longitudinal profiles feature grades where excavation cuttings transition directly into embankment fillings. Chainage measurements record linear distances along road alignments in standard surveyor chain units. Interpolating reduced levels between survey stations allows engineers to pinpoint grade intersection locations.

Highway design engineers calculate neutral points to optimize earth haul distances during grading operations. Accurate balance point location minimizes heavy machinery fuel consumption and earthmoving operational costs. Understanding chainage calculations ensures earthwork plans align correctly with topographic survey data. Six chains plus fifteen links represents an incorrect interpolation of the zero cut-fill chainage point. Six chains plus eighteen links overshoots the true mathematical neutral grade transition location. Selecting none of these is incorrect because a specific calculated chainage option provides the right answer.

Subject
Engineering
Topic
—
Difficulty
medium

Related questions

Q1. The daily excavation output per worker in regular soil is expected to be_______________?

Select your answer for: The daily excavation output per worker in regular soil is expected to be_______________?
Show answer

Answer: C. 3.00 cum

The standard daily excavation output per worker in regular normal soil is conventionally taken as three cubic meters. Worker productivity norms help contractors estimate labor requirements for manual excavation tasks on...

Q2. The unit rate for a specific construction task is governed by_________________?

Select your answer for: The unit rate for a specific construction task is governed by_________________?
Show answer

Answer: D. All the above

Unit rates for construction tasks depend on work specifications and execution methods. Material specifications dictate the quality, grade, and cost of inputs required for the task. The precise proportion of mortar direct...

Q3. Which brick structure component is quantified in square meters___________________?

Select your answer for: Which brick structure component is quantified in square meters___________________?
Show answer

Answer: B. Broken glass coping

Broken glass coping on boundary walls is measured and paid for in square meters based on its surface coverage. Surface area measurement applies because coping acts as a protective and decorative finishing layer on walls....

Q4. Which steel construction item is measured in square meters_________________?

Select your answer for: Which steel construction item is measured in square meters_________________?
Show answer

Answer: D. All the above

Steel items like collapsible gates and shutters are measured by their total surface area. Calculating surface area allows estimators to determine material requirements and coating needs accurately. Each specified element...

Q5. Volume measurements should be rounded to the nearest__________________?

Select your answer for: Volume measurements should be rounded to the nearest__________________?
Show answer

Answer: A. 0.01 cum

In standard quantity surveying practice, volume measurements are rounded to the nearest 0.01 cubic meter. Rounding to two decimal places provides appropriate mathematical precision for construction billing. Civil enginee...

Q6. When calculating quantities for reinforced cement structures, what value is assigned to the omitted concrete cover_______________?

Select your answer for: When calculating quantities for reinforced cement structures, what value is assigned to the omitted concrete cover_______________?
Show answer

Answer: D. All the above

Quantity rules explicitly mandate specific minimum concrete cover dimensions across diverse structural members. Cover values protect internal reinforcing steel bars from environmental corrosion and fire damage effectivel...

New!

Mock Test System is now available!

Prepare for your exam with interactive mock tests. Select your subjects, attempt 100 random MCQs against the clock, and see exactly where you stand.

Start Mock Test