At what height above the floor surface is a wash basin sink usually installed____________________?

Select your answer for: At what height above the floor surface is a wash basin sink usually installed____________________?
Show answer

Answer: C. 75 cm to 80 cm

Explanation

Wash basin sinks are standardly installed at a height of 75 cm to 80 cm above the finished floor. This specific height range accommodates average human ergonomics for comfortable everyday handwashing. Installing wash basins within this vertical window prevents user strain and back discomfort. Plumbing installation codes specify fixture mounting heights based on anthropometric human body measurements. Finished floor level serves as the consistent reference datum for all interior vertical measurements. Accessible design standards sometimes adjust these heights for children or individuals using wheelchairs.

Proper plumbing fixture placement ensures user comfort in residential, commercial, and institutional restrooms. Plumbers follow these standard height guidelines during rough-in and fixture installation phases. Ergonomic fixture design prevents repetitive strain injuries for people using public washrooms daily. Installing a wash basin at 60 cm is too low for adults and causes uncomfortable bending. A mounting height of 70 cm remains slightly below optimal ergonomic standards for general use. Restricting the installation height to a single fixed 80 cm ignores the accepted standard range.

Subject
Engineering
Topic
—
Difficulty
medium

Related questions

Q1. Up to what limit is the balcony area included in the total floor area_________________?

Select your answer for: Up to what limit is the balcony area included in the total floor area_________________?
Show answer

Answer: C. 50 %

According to standard building estimation rules, balcony areas are included at 50% in total floor area. Balconies are semi-open spaces and thus only contribute half their actual surface to calculations. Multiplying the t...

Q2. Which earthwork activity is generally not measured independently ?

Select your answer for: Which earthwork activity is generally not measured independently ?
Show answer

Answer: D. All the above

Preparatory tasks like setting out works, site clearance, and excavation steps are auxiliary and not measured independently. Billing rules dictate that preparatory activities are absorbed into general item rates rather t...

Q3. What is the standard daily output of a mason for brickwork using cement mortar in foundations and plinths ________________?

Select your answer for: What is the standard daily output of a mason for brickwork using cement mortar in foundations and plinths ________________?
Show answer

Answer: B. 1.25 m3

The standard daily output for a mason doing brickwork with cement mortar is 1.25 cubic meters. Foundations and plinths require careful alignment, establishing a baseline mason productivity rate. Empirical construction da...

Q4. What is the expected daily output of 1 : 2 : 4 cement concrete per mason_________________?

Select your answer for: What is the expected daily output of 1 : 2 : 4 cement concrete per mason_________________?
Show answer

Answer: D. 5.0 m3

The expected daily output for 1:2:4 cement concrete per mason is standardly rated at 5.0 cubic meters. Concrete placement tasks involve specific labor coordination to achieve consistent daily volume outputs. Standard con...

Q5. What is the standard daily output of a mason constructing a half-brick partition wall___________________?

Select your answer for: What is the standard daily output of a mason constructing a half-brick partition wall___________________?
Show answer

Answer: B. 2.0 m3

The standard daily output for a mason constructing a half-brick partition wall is measured in area and typically taken as 2.0 square meters.

Q6. What is the primary factor to keep in mind when formulating a detailed estimate________________?

Select your answer for: What is the primary factor to keep in mind when formulating a detailed estimate________________?
Show answer

Answer: D. All the above

Detailed estimates require evaluating material quantities, local market availability, and transportation logistics comprehensively. Material availability directly influences project timelines and procurement costs during...