Skip to main content
Sarkari MCQs Government Exam Question Bank
Menu
Question no. 893

Personnel working as forklift operators, factory security, and rework staff are classified as ____________?

Select your answer for: Personnel working as forklift operators, factory security, and rework staff are classified as ____________?
Show answer

Answer: D. manufacturing overhead

Explanation

Forklift operators, factory security guards, and rework staff provide essential support services that cannot be easily traced to specific units. These indirect personnel costs are accumulated in manufacturing overhead pools and later allocated to products. Because they support factory operations without working directly on the physical product assembly, they are manufacturing overhead. Manufacturing overhead includes all production costs except direct materials and direct labor incurred in the factory. Support staff wages represent indirect labor expenses necessary for maintaining a secure and functional plant environment. Cost accounting systems distribute these overhead pools using appropriate allocation bases like machine hours or labor hours.

Prime overhead is not a recognized accounting classification; prime costs typically combine direct materials and direct labor. Conversion overhead is an imprecise term that blends conversion costs with manufacturing overhead without standard acceptance. Factory overhead is a valid synonym, but manufacturing overhead is the broader formal accounting term encompassing all factory support costs.

Category
Accounting
Topic
—
Difficulty
medium

Related questions

Q1. The radical rethinking and redesign of operational processes to achieve dramatic improvements in cost, quality, speed, and service are called ___________?

Select your answer for: The radical rethinking and redesign of operational processes to achieve dramatic improvements in cost, quality, speed, and service are called ___________?
Show answer

Answer: A. reengineering

Reengineering involves the radical rethinking and redesign of operational processes for dramatic improvements. It aims for quantum leaps in performance rather than minor, incremental efficiency gains. This approach chall...

Q2. Increasing the volume of production results in ____________?

Select your answer for: Increasing the volume of production results in ____________?
Show answer

Answer: A. higher repair cost

Increasing the volume of production results in higher repair cost due to increased equipment wear and tear. Operating machinery for longer hours generates mechanical friction requiring frequent maintenance and part repla...

Q3. Expenses incurred to prevent the manufacture of products that fail to meet quality standards are called ___________?

Select your answer for: Expenses incurred to prevent the manufacture of products that fail to meet quality standards are called ___________?
Show answer

Answer: B. prevention costs

Prevention costs are specifically incurred to design and implement measures that prevent defects from occurring during production. These expenses include employee quality training, equipment maintenance, and rigorous sup...

Q4. The final stage in preparing the operating budget is ____________?

Select your answer for: The final stage in preparing the operating budget is ____________?
Show answer

Answer: B. implementing the decision

Implementing the decision represents the final execution stage where approved operating budgets are put into active practice. Management translates the finalized budgetary plan into daily operational targets and manageri...

Q5. A high number of subordinates reporting to a manager and the corresponding management level are referred to as _________?

Select your answer for: A high number of subordinates reporting to a manager and the corresponding management level are referred to as _________?
Show answer

Answer: B. broader responsibility center

A high number of subordinates reporting to a manager and the corresponding management level are referred to as broader responsibility center. Wide spans of control increase managerial oversight responsibilities across la...

Q6. Employing machine operators with lower skill levels than planned is classified as ___________?

Select your answer for: Employing machine operators with lower skill levels than planned is classified as ___________?
Show answer

Answer: A. cause for exceeding budget

Employing machine operators with lower skill levels than planned often leads to slower production and higher waste rates. These operational inefficiencies cause actual manufacturing costs to exceed the original budgeted...

New!

Mock Test System is now available!

Prepare for your exam with interactive mock tests. Select your subjects, attempt 100 random MCQs against the clock, and see exactly where you stand.

Start Mock Test