Skip to main content
Sign in Register
Question no. 611

Operating income will differ between two costing methods if the __________?

Select your answer for: Operating income will differ between two costing methods if the __________?
Show answer

Answer: B. inventory changes

Explanation

Operating income will differ between variable and absorption costing whenever inventory levels change during the period. When production equals sales and inventory is stable, both methods report identical operating income figures. Absorption costing capitalizes fixed manufacturing overhead into inventory, whereas variable costing expenses it immediately. If inventory increases, absorption costing defers fixed costs on the balance sheet, boosting income.

This income divergence is crucial for managers to understand so they do not misinterpret inventory build-ups as profit growth. Auditors and financial analysts routinely reconcile income differences between the two methods. Fixed cost changes alone or stable inventory levels do not cause an income divergence between methods. Income differences are driven specifically by fluctuations in inventory quantities from period to period.

Category
Accounting
Topic
—
Difficulty
medium

Related questions

Q1. The process of analyzing changes that occur in total revenues, operating income, and costs is known as _____________?

Select your answer for: The process of analyzing changes that occur in total revenues, operating income, and costs is known as _____________?
Show answer

Answer: D. cost volume profit analysis

Cost-volume-profit analysis examines how changes in costs, volume, and prices affect total revenues and operating income. This analytical framework models the mathematical interplay between operational drivers and financ...

Q2. In regression analysis, if the predicted cost is 65 and the observed cost is 19, the disturbance term will be __________?

Select your answer for: In regression analysis, if the predicted cost is 65 and the observed cost is 19, the disturbance term will be __________?
Show answer

Answer: A. 46

The disturbance term is calculated as the mathematical difference between the predicted cost and the observed cost. Subtracting the observed cost of 19 from the predicted cost of 65 results in a disturbance term of 46. R...

Q3. In regression analysis, if the observed cost is 62 and the predicted cost is 29, the disturbance term would be ____________?

Select your answer for: In regression analysis, if the observed cost is 62 and the predicted cost is 29, the disturbance term would be ____________?
Show answer

Answer: A. 33

The disturbance term represents the difference between the observed cost and the predicted cost. Subtracting the predicted cost of 29 from the observed cost of 62 yields a disturbance term of 33. In regression analysis,...

Q4. When plotting cost functions, machine hours and batch numbers are represented on ___________?

Select your answer for: When plotting cost functions, machine hours and batch numbers are represented on ___________?
Show answer

Answer: C. x-axis

Machine hours and batch numbers are cost drivers, which makes them the independent variable, and the independent variable is plotted on the horizontal x-axis. The dependent variable, total cost, goes on the vertical y-ax...

Q5. Under throughput costing, variable manufacturing overhead and direct manufacturing labor costs must be treated as ___________?

Select your answer for: Under throughput costing, variable manufacturing overhead and direct manufacturing labor costs must be treated as ___________?
Show answer

Answer: C. period costs

Throughput costing treats all manufacturing costs except direct materials as period costs expensed immediately. This extreme form of variable costing treats direct labor and variable overhead as operating expenses in the...

Q6. Multiplying the number of units by the per-unit price calculates ___________?

Select your answer for: Multiplying the number of units by the per-unit price calculates ___________?
Show answer

Answer: C. flexible budget variable

A flexible budget variable is calculated by multiplying the actual units of output by the budgeted per-unit price or cost. This dynamic calculation adjusts budgeted revenues and expenses for actual activity levels. Flexi...