If fixed setup costs are $21000 and variable setup costs are $11000, the total setup cost is _________?
Show answer Hide answer
Answer: D. $32,000
Explanation
Total setup cost is computed by adding fixed setup costs to variable setup costs. Summing twenty-one thousand dollars and eleven thousand dollars results in thirty-two thousand dollars. Combining both cost categories provides the complete expense incurred for production setups. Fixed setup costs remain constant regardless of the number of production batches run. Variable setup costs increase proportionally with the frequency of production batch setups. Batch-level costs like setups are crucial for accurate activity-based costing systems.
Manufacturers analyze setup costs to determine optimal production batch sizes and schedules. Activity-based costing assigns setup expenses directly to products consuming batch resources. Controlling setup costs helps companies reduce waste and improve overall manufacturing efficiency. Option A underestimates total setup expenses by suggesting a much lower cost figure. Option B represents an incorrect sum that fails to match the provided cost inputs. Option C drastically understates costs by subtracting instead of adding the values.
- Subject
- Accounting and Finance
- Category
- Accounting
- Topic
- —
- Difficulty
- medium
Related questions
Q1. If the flexible budget amount is $62000 and the actual outcome is $35000, the flexible budget amount is ___________?
Show answer Hide answer
Answer: A. $27,000
The variance represents the mathematical difference between the flexible budget and actual outcome. Subtracting thirty-five thousand from sixty-two thousand yields twenty-seven thousand dollars variance. This calculation...
Q2. If the flexible budget amount is $26000 and the fixed overhead flexible budget variance is $12500, the actual cost incurred is ____________?
Show answer Hide answer
Answer: A. $38,500
Actual cost incurred is the sum of the flexible budget amount and favorable variance. Adding twenty-six thousand dollars and twelve thousand five hundred gives thirty-eight thousand five hundred. This calculation account...
Q3. If the flexible budget variance is $105000 and the actual cost is $65000, the flexible budget cost is ___________?
Show answer Hide answer
Answer: A. $40,000
Flexible budget cost is derived from the mathematical relationship with variance and actual cost. Subtracting sixty-five thousand from one hundred five thousand yields forty thousand dollars. This formula isolates the ex...
Q4. If the gross margin is $2000 and revenue is $5000, the cost of goods sold is _________?
Show answer Hide answer
Answer: B. $3,000
Cost of goods sold is calculated by subtracting gross margin from total revenue. Subtracting two thousand dollars from five thousand dollars gives three thousand dollars. This standard accounting relationship links reven...
Q5. If the flexible budget is $40000 and the variable overhead flexible budget variance is $25000, the actual cost incurred is ____________?
Show answer Hide answer
Answer: C. $65,000
Actual cost incurred is calculated by combining the flexible budget and related variance. Adding forty thousand dollars and twenty-five thousand dollars results in sixty-five thousand. This addition accurately reflects t...
Q6. When unit demand is 18000, the annual relevant ordering cost is $150 per order, and the order quantity is 1500, the annual relevant ordering cost would be __________?
Show answer Hide answer
Answer: D. $180